Prediction of Soil Erosion on Embankment Slope of Qinhuangdao-Shenyang Special Line for Passenger Trains
|更新时间:2024-11-07
|
Prediction of Soil Erosion on Embankment Slope of Qinhuangdao-Shenyang Special Line for Passenger Trains
Vol. 15, Issue 2, Pages: 14-16(2001)
作者机构:
作者简介:
基金信息:
DOI:
CLC:S157.1U215
Published:2001
稿件说明:
移动端阅览
YANG Cheng yong 1. Prediction of Soil Erosion on Embankment Slope of Qinhuangdao-Shenyang Special Line for Passenger Trains[J]. 2001, 15(2): 14-16.
DOI:
YANG Cheng yong 1. Prediction of Soil Erosion on Embankment Slope of Qinhuangdao-Shenyang Special Line for Passenger Trains[J]. 2001, 15(2): 14-16.DOI:
Prediction of Soil Erosion on Embankment Slope of Qinhuangdao-Shenyang Special Line for Passenger Trains
摘要
为探讨施工期铁路路堤边坡水土流失规律
对秦沈客运铁路专线一段路堤边坡进行了人工降雨试验与天然降雨实测
结果表明
路堤边坡的主要侵蚀形式是沟蚀
沟蚀量较面蚀量大得多
主要侵蚀因子是次降雨量及路堤顶面宽度。最后提出了预测秦沈客运专线路堤边坡土壤侵蚀量的经验公式
Abstract
In order to investigate the behavior of soil erosion on the slope of railway embankment during construction
the experiment comparing artificial rainfall with natural rainfall on Qinhuangdao Shenyang special line of passenger trains was conducted.The results show that the main type of soil erosion is gully erosion
the amount of soil erosion caused by gully erosion is higher than that by surface erosion. The principal factor causing soil erosion on the slope is individual amount of precipitation and the width of the embankment. An empirical equation to predict soil erosion on the slope was given.