Research on Experiments and Laws of Wind Erosion in Typical Projects of Zhangji Railway Construction
|更新时间:2024-11-07
|
Research on Experiments and Laws of Wind Erosion in Typical Projects of Zhangji Railway Construction
Vol. 22, Issue 2, Pages: 47-50(2008)
作者机构:
作者简介:
基金信息:
DOI:
CLC:S157.1
Published:2008
稿件说明:
移动端阅览
KUANG Xing, BAI Ming-zhou, WANG Lian-jun, et al. Research on Experiments and Laws of Wind Erosion in Typical Projects of Zhangji Railway Construction[J]. 2008, 22(2): 47-50.
DOI:
KUANG Xing, BAI Ming-zhou, WANG Lian-jun, et al. Research on Experiments and Laws of Wind Erosion in Typical Projects of Zhangji Railway Construction[J]. 2008, 22(2): 47-50.DOI:
Research on Experiments and Laws of Wind Erosion in Typical Projects of Zhangji Railway Construction
With incremented railway construction in wind erosion areas
the problem of wind erosion of railway construction demand more attentions.Experiments are designed against road embankments
soil-excavated fields and sidewalks of Zhangji railway
in order to analyze the relation between the wind speed and sand transport flux
blown-sand structure and sand transport movement.The findings indicate that there is an obvious index relationship between wind speed and sand transport flux in different parts of embankment slope.With variation of blown-sand structure parameters in different parts
erosion of 3-meter design height embankment is independent of wind speed and wind direction and erosion phenomena translate from upwind side to leeward slope side as the wind speed increases and evident relationship between erosion
wind speed and wind direction of not less than 6-meter design height embankment shows up
yet with unobvious wind erosion movement.Wind erosion occurs in diversified segments of sidewalk and soil-excavated fields when wind speed surpasses soil starting wind speed.Studies and conclusions can contribute to the protection layout
construction and environment evaluation both in experimental and theoretical perspective.