Studies on Silt-Retention Dam Construction Scale of Yanan District, Shaanxi Province, North Area of Loess Plateau[J]. 2005, (5): 127-130.
DOI:
Studies on Silt-Retention Dam Construction Scale of Yanan District, Shaanxi Province, North Area of Loess Plateau[J]. 2005, (5): 127-130. DOI:
根据延安地区的水土流失特点,在对全区已建淤地坝进行综合调查分析的基础上。从侵蚀控制和拦泥减沙需要的两个方面对淤地坝建设规模进行了分析,依此确定延安地区黄土高原淤地坝的建设规模,淤地坝建坝总数27705座。其中骨干坝2847座,中型坝6804座,小型坝18054座,为延安地区的淤地坝建设提供理论依据。